IMPORTANT MESSAGES

Subscribe by email

  • Be the first to know
    when new articles and
    offers are published.

    Name:
    Email:

Contact us:

Subscribe to our monthly newsletter

  • * Filled with news, special offers, specific advice and novelties.
    Subscribe now and profit from the "Newsletter Readers Only" special offers!

Add to Google Reader or Homepage

Related Posts Widget for Blogs by LinkWithin

« BEST BUY Maintenance product | Main | More questions on underlayment (and gaps) »

17 August 2007

Guest post: Preparing a subfloor (underfloor)

Wood You Like not only gives out FREE advice on this FAQ-blog, you can also frequently find us doing so on various (UK-based) DIY-forums (DIY-not, E-build, Trust Experts, Green Building Forum etc). Other professional and dedicated to quality and service trade-persons are doing the same.

It's with great pleasure we can announce a first guest author post by one of these professionals:

Preparing a sub floor (underfloor)

Wooden sub floor

Floorboards, you need to use a long straight edge to determine how smooth your floorboards are. If they are reasonably smooth, i.e. 1-2mm run out, you need to over board with exterior grade plywood of 6mm thickness. If you have bad cupping of the boards you need to step up the thickness of plywood to bridge across the cupped boards. I.e. 12mm +. You can also sand the cupped boards flat and refer back to using the 6mm plywood.

Chipboard This type of sub floor should be over boarded with minimum 6mm plywood.
(Note Wood You Like: if you plan to install a wooden floor using the secret nailing method)

How to install plywood

Plywood should be left to acclimatise in the area to be prepared for a minimum of 48hrs. To fix the plywood to the sub floor it needs to be stapled with divergent staples, nailed with ring shank nails or screwed down. If thicker than 6mm it must be screwed. Always fix the boards working from the centre out wards. Your staples, nails etc should be at 100mm centres and 50mm apart around the edge + no more than 10mm from the edge. You should leave 5mm gap between the board joints. 

Concrete/screed

Use a long straight edge to determine dips and high spots of the sub floor. Any high spots should be ground down. Any low spots should be marked out on the sub floor. If the dips in the base are deeper than 3mm they should be filled with repair compound. All sub floors must be primed! Next you need to apply a suitable levelling compound. All compounds should be laid at a minimum of 3mm thickness and no deeper than 6mm. Mix all compounds as instructed on the bag.

Which smoothing/levelling compound should I use?

Water based: Very good levelling and flow. Also dries to a very hard surface. Down side is that it’s not forgiving with mistakes when mixing, damp or poor priming. This will result in failure.
Acrylic based: Dries to a very hard surface. It’s also difficult to make mistake mixing. Down side is that it does not flow as well as water based compounds.
Latex based:  Easy to mix and very forgiving but not as strong as other compounds, poor shear strength and does not flow very well.
Water based flex: Designed for problem floors which flex. It can be used over floorboards. Down side is the price and must be kept above 3mm deep.

Testing for sub floor moist.

To British standard the amount of moister in a concrete base you wish to lay on, must not be more than 75% relative to humidity. To test this you need a working damp proof membrane and a cured concrete base if new. The test should be done with a hygrometer. This is a box which is sealed to the floor for on average of 48-72hrs. Different mixes and depths take different times to take reading. More than one area of the sub floor must be tested. New concrete will need at least a month per inch to dry! I.e. 6” needs 6 months drying time.
(Note from Wood You Like: other moist measure equipment (tested and approved to be used for floor installation preparations) the mentioned above measures the percentage of moist content in the screed.  If this type of equipment is used the reading should not exceed 2% moist content.)

Surface epoxy dpm.

If your underfloor has a failed damp proof membrane or no damp proof protection at all, you can install an epoxy coat to act as a surface damp proof. This will work up to about 92% relative to humidity moister content, depending on which product is used. You can also use a surface membrane to fast track fitting your new flooring on new concrete sub floors. Make sure you follow instructions supplied with the product you choose.

Matt Bourne (August 2007)

TrackBack

TrackBack URL for this entry:
http://www.typepad.com/services/trackback/6a00d8341c660f53ef00e54ecc61698833

Listed below are links to weblogs that reference Guest post: Preparing a subfloor (underfloor):

» Floor preparations over bitumen - guest post from Wood You Like F.A.Q.
Our British wood flooring Association colleague Matt Bourne brings you the following advice when faced with bitumen on your underfloor or subfloor: Question: Is there any way we can screed over bitumen when we want to glue a wooden floor [Read More]

Comments

About

  • Wood You Like Charing, Kent UK Wood You Like
    Natural Wooden Flooring
  • Wood You Like applies and promotes the Kiss principle (Keep It Simple Sweetheart) in all areas of the business.
    This means we will give you straightforward advice in plain English and without the technical jargon.
    Our tips and advice blog covers many areas of Natural Wooden Flooring: from the benefits, installation tips to taking care of your wooden flooring.

    It is very simple for you to ask your own question: follow this link to our online question form
    Here you can ask your own question and we will answer it to the best of our knowledge and as quick as possible. If relevant your question will be turned into a new post for the benefit of our other visitors.

    As the acknowledged authority on wooden flooring, many architects, interior designers and property developers, nationally and locally, frequently call 'Wood You Like' for advice on choice and suitability of different wooden flooring and advice on the fitting and maintenance.
    If you have a query, try our 'tips and advice' pages that follow - or give us a call on 01233 713725 for your personal solution to wooden flooring.


E-booklet

  • Download our E-booklet: Benefits and Advantages of Natural Wooden Flooring.

    Wood You Like E-Booklet on Benefits and Advantages of Natural Wooden Flooring
    In this booklet we explain the many benefits natural wooden flooring will give you:

    * you'll learn to distinguish between the many differences in wood, wood-types, floor-types available on the market so you will never be confused again;

    * which floor or wood type is most suited for which area/room and we give tips on which floor suits which design style; why different grades in wood mean different prices;

    * the differences (advantages/disadvantages) between oiled finishes and lacquered/varnished finishes

    * and much more to help you select your own perfect Natural Wooden Flooring.

    Download our E-booklet: Benefits and Advantages of Natural Wooden Flooring.